Jump to content
Security Installer Community

james.wilson

Admin
  • Posts

    30,690
  • Joined

  • Last visited

  • Days Won

    289

Everything posted by james.wilson

  1. id like to offer some but I don't use it. You need info from the pro's that do.
  2. you need to link out T and connect to just the A connections
  3. just to confirm this final exit circuit is a door not a movement detector? is there no option for infinite exit time?
  4. that's back in the day when people cared
  5. fair play for a managed switch, all mine at work are unmanaged.
  6. https://www.securitywarehouse.co.uk/catalog/intruder-alarm-c-36/movement-detectors-c-36_116/all-c-36_116_37/pyronix-fpkx15dt3-15m-dual-technology-digital-detector-p-2114.html
  7. iirc Pyronix had issues with the lens degrading. You used to be able to get replacement lens
  8. -38 is proper cold, I reakon that is specialist area. What do you use other than kit designed for minus 20?
  9. What devices do we all use?
  10. is the signalling using udp or tcp?
  11. I accept that but I thought the question was about a service not a takeover. I reakon an hour to do a takeover is speedy depending on the panel
  12. I wouldn't do the resistance checks on the cable assuming eol. If DP then its seconds. Id agree it shouldn't take an hour 30 mins for 8 or so circuits. Do you do the paperwork check and the walktest on the same walk around or separate walks?
  13. from memory too I think your right But its a way past it bit of kit good in its day
  14. Ah yes a terminal, cutters and a meter then. When you have to plug into stuff?
  15. Ive just got a surface book to replace my surface pro. I rated the pro as I used it for site visits, plans etc what do you prefer as an onsite device?
  16. yeah but unless low risk you wouldn't use a maglock
  17. if you mean compliant then no imo it isn't
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.