Jump to content
Security Installer Community

james.wilson

Admin
  • Posts

    30,648
  • Joined

  • Last visited

  • Days Won

    287

Everything posted by james.wilson

  1. I have tested extreme range of this, on a farm environment it was about 1km. At the time wish I had the powered mesh unit in theory I could of got 8, I will at some point do range testing on the leading manufacturers, but that needs a beach to be fair
  2. Its better to lock to protect the company and insurer etc. Plus the programming belongs to the maintainer. eg SIA lock all but do default on request. If the ex client doesnt want to pay for the default, boards are defaulted foc at the office. Issues with gear is how they are programmed, passwords used in onvif, how systems are setup etc. Plus incoming company should always default to know it is programmed to their requirements with the client that may have changed. Had a conversation recently regarding this and there is the potential for liability issues for the outgoing company 'if' the incoming company can prove they didnt change xyz option. Always better to default on leaving and incoming
  3. Agreed that's how I did pre sharpie that would of helped loads
  4. That and foil I remember doing that as a 14 Yr old
  5. For the sla battery of early sab
  6. Sorry OP Ive never worked on a DSC system However it sounds like it configured to only talk to its previous panel which is obviously unavailable. Id assume there is a reset procedure that may require the old keypad to program the 'new old' one in
  7. I doubt Pete would give me the keys to the ferrari, or the Merc I'd be lucky to get one of the yaris or a too big van
  8. no the dumpbox was for classics. It may work on smaller panels though ive never tried you use the keypad with the spi keys though
  9. onto a SPI key?
  10. you can set ee to instant when part set just like you can set access circuits when full set
  11. Thats a good shout re movement of the key, regarding faraday just put them in the microwave, off obviously If your car gets nicked you badly need a new microwave!
  12. Im sure many of your clients have had this happen to them, how do you lot advise against it, do you drive a keyless car etc? Mine isnt keyless and i wouldnt want one but i get the convenience of it. However im still astounded new cars are sold with the same tech that allows relay or easy key cloning.
  13. agreed its an awful option and should never be used If its wired use a dt, if rf use the hkc dt or better still dont use space protection in a shed
  14. as you have found yes you can change the ee to alarm on part det like you can have access etc when full set
  15. If its a pir in a shed that isn't a great idea
  16. No it doesn't have any inputs for that. Just upgrade to a panel with app support Plus it shouldn't be randomly activating fix that first imo
  17. yes and they are outdoor rated
  18. id use active beams for scaffolding. you can get wireless ones then use an rf door contact with inputs to get it to the galaxy. I dont use galaxy rf but i think you need an rf portal now not an rf rio. But im not 100%
  19. agreed but if its in short, putting it across a battery with no fuse will spark a lot...
  20. via a fuse... If your disconnecting the sounder and it showing 12v in alarm then you either have a knackered sounder or cable issue. Have you metered the cable?
  21. The days of dial tone meaning delivery are long gone Imo everyone needs a polled service. Even ring polls ffs and who would use / trust that here. I'd be amased on the trade side if anyone was using this sort of thing for family friends etc
  22. I use a hkc control panel and it's rf stuff Then my ha platform is home assistant. I then link my alarm to my ha with an esp 32 module, flashed with esp home
  23. I change all batteries every 2 years. Panasonic or duracell meaningless see attached graph showing discharge curve. They run then once they start to drop are dead within 1 - 2 weeks see above Yes, as you say the device should poll every x seconds or minutes (depends on brand) some stuff can be hours! Once it hasnt recieved them over period x then the panel reports supervision failure
  24. Boiler control next but that's brobably already done
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.