Service Engineer Posted October 24, 2005 Share Posted October 24, 2005 many engineers prefer to fit the main panel, keypad and external sounder first I have always done it that way, and from what other engineers have said "I work Backwards", have mostly believed us panel first installers were the minority. ........................................................ Dave Partridge (Romec Service Engineer) Link to comment Share on other sites More sharing options...
morph Posted October 24, 2005 Share Posted October 24, 2005 Its good practice Dave, as you dont get to the end of the day and find you have faulty panel or bell to fit in the dark. Link to comment Share on other sites More sharing options...
whistle Posted October 24, 2005 Share Posted October 24, 2005 I always fit in this order 1 All cables in and boards, carpets etc back down 2 All protection fitted pirs, contacts etc inc rkp and spk 3 Fit panel and power up ( put in eng mode and leave for now ) 4 Fit bellbox and dummy 5 Program and commission system 6 Put all tools away and tidy up 7 Demo system and sort out paperwork 8 Take the ££££ and go home Job done Link to comment Share on other sites More sharing options...
ian.cant Posted October 25, 2005 Share Posted October 25, 2005 Its good practice Dave, as you dont get to the end of the day and find you have faulty panel or bell to fit in the dark. I would that its not good practice from the way i was taught my craft. Always to work from the item your feeding back to the supply, this is a safe method of working which makes sense to me. Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.