As a NICEIC / ECA registered member it does fall on the electrical contractor. as turning a MCB off at the CU does not constitute safe isolation. On the other side you have the gate installer and they would not be out of the woods as any work carried out on electrical system should be checked that the circuit is not energised as per BS7671