Jump to content
Security Installer Community

jammin31

Member
  • Posts

    42
  • Joined

  • Last visited

  • Days Won

    1

Posts posted by jammin31

  1. Being honest i always try to survey a site. 1. Because it is always good to be professional and meet your possible client, 2. If you dont and then get the job and turn up its sods law that you will hit a problem which ends up costing you more time and money, obviously on the bigger jobs more than small domestics.

    better to be safe than sorry plus whilst on site you can ensure there getting whst they need rather than what they think they need from reading posts on google !

  2. Thats a huge amount from the off ! I think i will try the others as a demo first and see what suits us best but im sure there is a basic requirement of the SSAIB and NSI of information and reports we have to provide via this type of softwate ? Or have i just made that up !

  3. It will but if you imagine a shed with a MC and a PIR hopping through a MC down the path and it gets lost, the devices in the shed are both lost.

    if your going to use a device as a booster then use 2 and position them so you have two devices to route back to the 8 / 32xpw

  4. I maybe wrong but that lens is in all detectors pet or non pet and would be better left in full stop, it wont make any difference to the protection the system offers you.

    and yes a zone activated after a final exit zone is entry route if you want the zone to be passed without triggering it on route to the keypad / panel.

  5. Personally i would not bother with them and where possible screened cable is always the better shout.

    if you do have major issues with induced ac just strap the panel, million times better results and no need for an additional part no materr how little they cost.

  6. Be wary of only a single repeater because if it ever fauls then everuthing talking back through it will go down leaving you unprotected.

    also test it in advance, Texecom is good but getting it to work on its maximum range is always going to be dodgy and if there is problems it will be sods law they only turn up once you've left thinking all is fine !

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.