Skip to content
View in the app

A better way to browse. Learn more.

Security Installer Community

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Accenta G4 Mini Panel - Internal Siren

Featured Replies

Gents,

Great site with bags of information thanks.

I have a Accenta G4 mini panel with 4 wired zones, 1 external Reson8 sounder and 1 external keypad. I have been happy with its perforamnce thus far.

I have wired in a seperate strobe that is for use indoors, this works well. I have also connectd in an internal siren and have connected this in parallel to the strobe so both operate together under alarm conditions.

My question is...if the alarm is triggered, when it times out after 20 mins (my setting) the external sounder will mute, will this be the same for internal strobe and hence the siren? I would prefer the internal siren to mute when the external sounder mutes. If I have got this wrong can you advise please? The engineering manual makes no reference to any of this.

much appreciated in advance thanks

Depends how you've wired it - siren will be timed but normally strobe output continues until unset, so if you connect a siren to a strobe output it will go on 'forever', (or blow the fuse!).

  • Author
Depends how you've wired it - siren will be timed but normally strobe output continues until unset, so if you connect a siren to a strobe output it will go on 'forever', (or blow the fuse!).

thanks for the quick replies.

Thought this might be the case! This will cause problems. Am I better to connect it to the external sounder terminals at the panel? If so could I connect to:

D postive (+VE) supply

B negative(-ve) sounder trigger

thanks for the quick replies.

Thought this might be the case! This will cause problems. Am I better to connect it to the external sounder terminals at the panel? If so could I connect to:

D postive (+VE) supply

B negative(-ve) sounder trigger

Yes it will work but you need to consider the load on the panel when all the devices are active, as RJBsec hinted it could overload the panel and blow a fuse (or panel).

  • Author
Yes it will work but you need to consider the load on the panel when all the devices are active, as RJBsec hinted it could overload the panel and blow a fuse (or panel).

Checked out the currents and still have a safety factor of 2 so should be ok.

Thanks for the help guys

2 what?

2ma I'm thinking!

Two sounders and two strobes on a domestic ADE panel, it must be getting close I would have thought.

2ma I'm thinking!

Two sounders and two strobes on a domestic ADE panel, it must be getting close I would have thought.

Was what I was thinking ... hope I'm wrong ... wait, I smell smoke :D

Archived

This topic is now archived and is closed to further replies.

Recently Browsing 0

  • No registered users viewing this page.

Important Information

By using this site, you agree to our Terms of Use.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.