March 25, 200620 yr comment_92402 Hi, I'm fitting a system as a subbie and the kit specced by the surveyor includes A Honeywell G2 (first I've seen but I know Galaxy), power rio, 2 rios, two keypads and a siren. It has 25 standard DualTecs on it. I assume the RedGSM will go on it's own PSU. My mate reckons it's woefully underpowered. Your comments would be welcome. Rgds. Link to comment https://www.thesecurityinstaller.co.uk/community/topic/9913-honeywell-g2-power/ Share on other sites Share on LinkedIn Share on X Share on Facebook {lang="reddit_text" Share via email Share on Pinterest More sharing options... Share this post
March 27, 200620 yr Author comment_92666 Ta, fella. Had another look now I have the drawings and it should be fine as long as I use the smart rio for the lion's share of the power. TB Link to comment https://www.thesecurityinstaller.co.uk/community/topic/9913-honeywell-g2-power/#findComment-92666 Share on other sites Share on LinkedIn Share on X Share on Facebook {lang="reddit_text" Share via email Share on Pinterest More sharing options... Share this post
Archived
This topic is now archived and is closed to further replies.