Steve23 Posted April 29, 2020 Share Posted April 29, 2020 Hi guys. I'm installing my new Reson8 bell box and I have wired the wiring into the control panel (Honeywell flex) as per the instructions but there was no +12v in the terminal block for the bell in the panel so I put that wire into the intellibus +12v terminal just above it. The bell box has been installed on the wall with the cable fed through but it's not been wired up yet as the weather changed. But I did test the tamper wires and that worked and thought I would read +12v from that one. I thought the bell monitored for power loss so presumed the 12v would be permanent am I right or wrong. Thanks. Link to comment https://www.thesecurityinstaller.co.uk/community/topic/43761-does-the-reson8-bell-require-permanent-12v-live/ Share on other sites More sharing options...
james.wilson Posted April 29, 2020 Share Posted April 29, 2020 yes any sab needs a permanent 'hold off' supply securitywarehouse Security Supplies from Security Warehouse Trade Members please contact us for your TSI vetted trade discount. Link to comment https://www.thesecurityinstaller.co.uk/community/topic/43761-does-the-reson8-bell-require-permanent-12v-live/#findComment-499930 Share on other sites More sharing options...
Steve23 Posted April 29, 2020 Author Share Posted April 29, 2020 19 minutes ago, james.wilson said: yes any sab needs a permanent 'hold off' supply Thanks I'll check my wiring Link to comment https://www.thesecurityinstaller.co.uk/community/topic/43761-does-the-reson8-bell-require-permanent-12v-live/#findComment-499933 Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now