March 6, 200719 yr comment_156426 Gents I am looking for CCTV Commissioning Engineers to work on the Underground in London. The rate of pay is ***** usually based on a 10 hour shift. The company I am working with has a mature policy based on as long as the work is done people are left to their own devices. If you get 8 hours work done in 4 then you see where I am going. Preference will be given to Subcontractors who have worked on the Rail Systems previously but good CCTV Commissioners will be considered. The number here to reach me on is 0208 246 4226 or email Cv to robf@momentumsecurity.co.uk Please do not post hourly rates in the public forums. Edited March 6, 200719 yr by alarmgard Link to comment https://www.thesecurityinstaller.co.uk/community/topic/16403-subcontract-work-on-the-underground/ Share on other sites Share on LinkedIn Share on X Share on Facebook {lang="reddit_text" Share via email Share on Pinterest More sharing options... Share this post
March 6, 200719 yr comment_156431 If you get 8 hours work done in 4 then you see where I am going. As my family are regular underground users I'd rather that jobs were specified and costed accurately and done properly with no corners cut, thank you. Edited March 6, 200719 yr by amateurandy Link to comment https://www.thesecurityinstaller.co.uk/community/topic/16403-subcontract-work-on-the-underground/#findComment-156431 Share on other sites Share on LinkedIn Share on X Share on Facebook {lang="reddit_text" Share via email Share on Pinterest More sharing options... Share this post
March 6, 200719 yr Author comment_156435 As my family are regular underground users I'd rather that jobs were specified and costed accurately and done properly with no corners cut, thank you. I was not implying that any corners should be cut, when pricing a job my client will estimate number of hours needed to complete the job to the required standard, if there should be a highly trained engineer doing the work and he is able to complete the job in less time I was indicating he would still be paid for the full 8 hours. That was point maybe quite badly made. Sorry. Link to comment https://www.thesecurityinstaller.co.uk/community/topic/16403-subcontract-work-on-the-underground/#findComment-156435 Share on other sites Share on LinkedIn Share on X Share on Facebook {lang="reddit_text" Share via email Share on Pinterest More sharing options... Share this post
March 6, 200719 yr comment_156436 I was not implying that any corners should be cut, when pricing a job my client will estimate number of hours needed to complete the job to the required standard, if there should be a highly trained engineer doing the work and he is able to complete the job in less time I was indicating he would still be paid for the full 8 hours. That was point maybe quite badly made. Sorry. Apology accepted. In approriate comment removed, I will also clean up the rest of the topic if you both agree. Edited March 6, 200719 yr by alarmgard Link to comment https://www.thesecurityinstaller.co.uk/community/topic/16403-subcontract-work-on-the-underground/#findComment-156436 Share on other sites Share on LinkedIn Share on X Share on Facebook {lang="reddit_text" Share via email Share on Pinterest More sharing options... Share this post
Archived
This topic is now archived and is closed to further replies.