Hmmm..... Tricky to put into words, like a set of double doors two contacts across 1 resister then EOL and back to the panel. Its a grade 2 system so all connections will need to be made in appropriate JB's. I plan to series up the tampers i.e. R/S loop and JB switches then sort the 2 contacts across one resister bit.