Intruder Alarm Routine Inspection


Taco

Recommended Posts

anyone know what the codes of practice are re: 6monthly/yearly inspections on intruder systems, and what checks MUST be carried out to conform to standard?

Every day is a school day

Link to comment
Share on other sites

  • Replies 100
  • Created
  • Last Reply

Lol,

A model pmv was in 4737. Using you co. Manual to flesh it out

Get on site, flash id badge, check against spec / on site docs, wall test, measure volts current & circuits, bells plus REM signals record in log bog ECT..

(Best I can do off a phone )

Mr? Veritas God

Link to comment
Share on other sites

also full set test where possible, not just toggling o/p's. On larger sites where bi-annuals then document which devices are tested as you may not do 100% per visit, but must do 100% over 12m. Document any changes/shortcomings and advise of no PA's whilst you have the system on test.

Nothing is foolproof to a sufficiently talented fool.


Link to comment
Share on other sites

Something like this:

The alarm system detailed in this design proposal will be maintained in accordance with the EN 50131-1:2004/PD6662 and DD CLC/TS 50131-7:2003 series. 2 maintenance services will be carried out per year, consisting:

A Test tamper detection

B Test setting & unsetting

C Check entry & exit procedures

D Test power supply & circuits

E Test operation of detectors

F Operation of warning devices

G Test operation of ATE

.

.

.

.

PM me for access to the SSAIB members discussion area.

Link to comment
Share on other sites

This is what we use

Do you really do all those checks for every maintenance reidy? :fear:

Check bell delay(if programmed) and shut off times

on every maintenance?

I wonder how many check every tamper circuit/

:ninja:

Link to comment
Share on other sites

Do you really do all those checks for every maintenance reidy? :fear:

Check bell delay(if programmed) and shut off times

on every maintenance?

I wonder how many check every tamper circuit/

:ninja:

That's the form we got from the NSI, so I guess that's what they think we should be doing

Hey Ho, Lets Go

Link to comment
Share on other sites

just out of curiosity how many actually check tampers on all devices during a routine maintenance.

Never checked all tampers but more than often checked some. Bell delay done on full set check.

Why do you ask anyway?

Link to comment
Share on other sites

Never checked all tampers but more than often checked some. Bell delay done on full set check.

Why do you ask anyway?

i asked because every maintenance sheet i have ever seen always has that on it.

if we were to check all tampers we wouldnt get as many calls done and im sure cause more problems then when we started

The same will bell cut off timers.

im sure the majority of engineers never test that feature and just rely on there judgement taking into account the age and condition of the bell in general.

Link to comment
Share on other sites

depends on size, complexity & risk.

tamper wise, tend to rotate selected each visit. using fsl is an advantage.

How is using fsl an advantage ?

the tamper could still be disconnected inside the detector can it not

Link to comment
Share on other sites

How is using fsl an advantage ?

the tamper could still be disconnected inside the detector can it not

It could but it should have been checked on commissioning of the system and if its set up for engineer/anti code no one can open a device without you knowing.

Link to comment
Share on other sites

  • 1 month later...
  • 1 month later...

OLd enough to remember 9500 lims.Would not advise checking tampers on them each visit !

Yep through a quirk of fate I'm still working 9500/3400 systems..Regularly. I love 'em though. You can crash some of them just by literally just 'manipulating' the relay card but you can still have them reprogrammed in a few minutes. Sadly since they discontinued the LIMs they now get replaced when they extend the buildings. Got to say they have lasted longer on the whole than many newer panels and expanders I have fitted. Quality engineering.

I was all posh today though...Crashed and reprogrammed a Galaxy 3..

"They put me in a box with my coat on! I know it doesn't sound much.."

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.