Jump to content
Security Installer Community

goncall

Trade Full Member
  • Posts

    9,216
  • Joined

  • Last visited

  • Days Won

    118

Everything posted by goncall

  1. the sad thing is you actually believe that.....
  2. tray for me,more so if your gonna use it in the future,dont forget the "for fire alarm cables only,all other cables will be removed " stickers every 2 meters to stop the tray hoppers
  3. im waiting for the rest of the paid reviews.....
  4. I was talking takeovers,you say you default panel and reprog,fine if a 2 bed semi but a large commercial with no paperwork you've lost 3yrs maintenance money just putting it back to the way it was
  5. of course you do,why crash and reprog back to the way it was
  6. do you have a list of other co's engineer codes? most do
  7. thats the correct way to do it,it could be a 2 zone panel or it could be a 200 zone panel,its not about the ability to crash and reprog or the cost
  8. if customer owned equip,default to a code they want and walk away,its their problem after that
  9. thats because your neither its a poor attempt to get site traffic up,its all ********
  10. he cant even fit alarms so your in good company
  11. thats makes you 31.you little tinker,showbiz ages have even reached the alarm game
  12. ah well the one 520 you couldnt fix and dissed a neg didnt fix the cause did it,so was it a phase problem or a supply problem or something else
  13. but thats the whole point of rios lims zems etc,might as well wire everything back to the panel if your worried about phase issues
  14. have you been eating steak al...
  15. just take a picture post it up..sorted its not hard,otherwise people just think your talking ****....
  16. can you not just go to site and take a picture of it
  17. how is the cooker by the way
  18. all of them,thats why your contacts are latching
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.