  1. for once a job went right.. 15 door access system came in 2 days early and quite a bit of stuff left over. It makes a change making a few extra £££

  2. Evo Triangle in the morning :)

  3. look @ the time ?

  4. LOL, since when did a Galaxy have 10k EOL... our take over had zones spared out with 10k's fitted as EOL ????

  5. is on form today, just got orders for 3 x monitored jobs :)

  6. Sunny spain in the morning :)

  7. is it me or is this site running real slow :(

  8. is also on call tomorrow

  9. God i remember fitting all them. At one point we where fitting 5 a day every day for weeks on end.....
  10. 82 i mean.... lol @ low.... I have on working on a 23 and it never drops out.
  11. I have had many signal issues in town centre's. Saying that the one we fitted today in a metal clad building had a signal of 8.2 Not to keen on the new antena the small black one. If fitted on a galaxy you have to cut a 20mm hole in the top of the panel, if you try to use the knock outs provided you would not get the panel lid on or off.
  12. Alarmguard is no spring chicken. LOL
  13. We have fitted around 600 to date and found them very easy to install and easy to program. Only had a few that had to go back with problems. This was one batch.
  14. RS50 and 100 not the best thing to program and no NVM in them.
  15. i noticed when we put some fire jobs on the system and after 6 months it did not show a RM due. We almost forgot to service them .. not good
  16. PS : he went to one of our grade 3 jobs aswell.?? Its ready to hand over to my mate with a NSI co. maybe not now
  17. yes,, i have a question ?? if i enter a job as monitored it wont show a RM visit after 6 months ?? is it me?
  18. Quick update: Today we had our SSAIB inspection and passed with out any Deveations at all. Now its time to go out and get them URN numbers.
  19. No advertising at all. Only about 15% of our work is subby work. The rest is self generated or recomendations.
  20. Well chaps its now 6 months since We set up on our own. We have had 3 days in that time with no work. Things are going realy well and we have just taken on our 1st full time engineer, 3 of us now. But i agree with the rest of you i am now working about 100 hours a week inc paper work book keeping etc. We should be SSAIB aproved within the next few weeks. I feel i could never go back to cards in now. : Andy
  21. Do you remember the realy old mats that had a tarton cover on them. I serviced loads of dry cell systems over my time the one's with the end of line flag battery with a diode fitted to them, all well over 30 years old. It had a green lamp on the front that lit up when you pressed the test button if all was clear. The whole house would be run in brown twin a + loop and a - loop in the same cable mats caused a shot and doors went on on of the loops. F,in nightmare to find a fault.
  22. I fitted the system in the chapel of rest in my local town and had to fit a detector in the embarming room. Thay said if i waited an hour thay would clear out the bodys waiting to be done. I went in anyway. Not a very nice sight stainless tables with bodys laid out ready to embarm just saw heads and feet but that was enough.
  23. Mate i know all about them. A lot of cash for not very much. And very pushy sales reps. We are Northwest based and would be happy to quote you.
×
×